Arrow Energy Solutions - Header Picture
Air Conditioning Inspection
Home
Energy performance certificates
Display Energy Certificates
Air conditioning inspections
Consultancy Services
About Us
Contact Us
       
 

Air Conditioning System Inspections

Air conditioning systems can account for 50% of the energy used in a building, and are therefore specifically targeted in the new legislation. Arrow Energy Solutions are here to help you comply with EPBD Article 9 and the Energy Performance of Buildings Regulations. The Article 9 Air Conditioning Inspection is gaining recognition as an excellent tool to help you identify energy-saving opportunities. It often pays for itself in just a few weeks when no and low-cost measures identified during the inspection are implemented. The aims of the inspection are to:

► Provide building owners/operators with information about system performance, and

► Identify opportunities to reduce your CO2 emissions and save energy and money

The output of the inspection will be a report highlighting measures which, if adopted, will have the potential to save energy and money within a reasonable payback period. Inspection reports will remain valid for five years, after which the system will require another inspection.

Which systems require inspection?

An air conditioning system is defined within the regulations as “a combination of all the components required to provide a form of air treatment in which the temperature is controlled or can be lowered, and includes systems which combine such air treatment with the control of ventilation, humidity and air cleanliness”. The regulations do not apply to process cooling systems and are being adopted in two phases. The first phase applies to systems with a rated cooling capacity above 250 kW and the second phase for the remaining systems over 12 kW. The cooling capacity of an air conditioning ‘system’ is further defined as “the sum of all individual cooling units under the control of one building owner or operator”. It may therefore include smaller ‘window-box’ and split units which are considered to be part of the ‘system’. 

When will the Regulations apply?

► First inspection of all existing systems over 250 kW cooling capacity completed by 4 January 2009.

► First inspection of all existing systems over 12 kW completed by 4 January 2011.

► New systems over 12 kW installed after January 2008 must be inspected within 5 years of being put into service.

Who can inspect air conditioning systems?

Air conditioning system inspections can only be completed by a qualified and accredited air conditioning system assessor. Our CIBSE Level 4 Air Conditioning Inspector is fully accredited to undertake your air conditioning system inspection. We are one of the first companies in the UK able to provide both simple and complex inspections.

Contact Us

To discover how Arrow Energy Solutions Ltd can help you comply with the Regulations by providing your air conditioning inspection reports, please ring us on 0870 042 7264 or click here.

 

Low Carbon

>
 
 
     
Energy Cert

The latest Government info from CLG - Click here

 
Low Carbon

CIBSE Air Conditioning Inspector